The selling price of a new home is based on the following criteria.
Land cost (4.5 million dollars per acre)
Building construction cost (range $60-150/ sf)
Site improvement cost ($28/sf)
Soft cost (varies)
Company profit (6%)
The most important component to the price of the home is the land cost. In order to lower the home selling price TIC has to lower its land cost substantially and that is very unlikely. The small declining home prices that we are seeing are the result of the builders re-negotiating their land deal with TIC. Many builders prefer to build on the Ranch due to a no risk factor. Slow time like this Irvine builders are not carrying the cost of the land. Many Inland Slumpire builders accumulative interest and standing inventory of un-built land could BK a company overnight.
Due to the no risk from the builders end TIC limit the builders’ profit margin and any amount over goes to TIC. Builders must submit plans to TIC for approval. TIC has in house marketing experts, architect, planners and landscape architects to review design to meet their higher standard. For many other cities the city planners are the aesthetic and floor plan reviewer. The carrying cost of the aesthetic panel is very high and no cities could afford it unless design professionals volunteer their time like Rancho Santa Fe, Palos Verde, San Marino, Santa Barbara, Montecito and Floral Park. Places like VOC and Ladera did not have the strict aesthetic reviewing process like TIC therefore the end result is not the best. The city planners are not trained to seek for a good floor plan function or the accurate interpretation of the architectural styles.
The overhead of TIC is incorporated in the high land cost. We would not be seeing a huge price drop here.
Building cost is directly tied to the selling price. Complicated house shape like a 16 corner house with numerous courtyards could double the foundation, structural, and roof cost. Richmond American project in Portola Spring is a good example of an expensive structure. Consumers pay for the extra cost in the selling price. Houses with 4 corners with simple plans are the most cost effective to build so the selling price is most affordable such as the detached condos like Decada. Town homes and condos are the most expensive to build due to the larger structure, sound attenuation, double wall, extra shear wall and fire separation. High rise is the worst of all and that is why a unit could cost about a million. Good architect with strong discipline can design to meet the goal of floor plan and structural simplicity to help reduce the cost of the selling price. (It is extremely important to create a good house to meet the design criteria with simple forms and avoid any attachment to the neighbors’ house. The reduction of $10-30 per sf could translate up to $45,000 price reduction for a 1,500 sf home.
Site improvement such as utilities, drainage duct, street and sidewalk, landscape, irrigation are just some of the cost but the most expensive are the retaining walls and stairs for slope. Some 3 story designs with the bunkered garages in retaining walls and lifted walkways are the most expensive to build. The selling price of the home is not worth the product purchased. Architect should not even go there to complicate a house. Most consumers hate climbing 3 flights of stairs between bedrooms. (It is very important to consider the building type in reducing the site improvement cost)
Soft Cost encompasses the marketing PR, brochure printing, consultant’s fee, employees, design office, and operational budgets. Employing fewer staff and paying the architect, engineers and interior designers less could lower the overhead but this method often produces inferior architectural design. (It is not likely a factor in reducing selling price)
Company profit is limited to 6% by TIC (not likely a factor in reducing selling price)
The higher the number of homes per acre also increases the building hard cost proportionally. By attaching the units the builder could pack in more units. Logic tells us the unit should be much cheaper since the land price is constant. The high price reflected in the attached projects is paying for the high construction cost of the building.
The key for the builders is to hire the best architect who understands all the parameters of todays demanding buyers' market. A good designed house can translate to lower construction cost and yet looks good. It is a win-win solution for TIC, builders and consumers.
Land cost (4.5 million dollars per acre)
Building construction cost (range $60-150/ sf)
Site improvement cost ($28/sf)
Soft cost (varies)
Company profit (6%)
The most important component to the price of the home is the land cost. In order to lower the home selling price TIC has to lower its land cost substantially and that is very unlikely. The small declining home prices that we are seeing are the result of the builders re-negotiating their land deal with TIC. Many builders prefer to build on the Ranch due to a no risk factor. Slow time like this Irvine builders are not carrying the cost of the land. Many Inland Slumpire builders accumulative interest and standing inventory of un-built land could BK a company overnight.
Due to the no risk from the builders end TIC limit the builders’ profit margin and any amount over goes to TIC. Builders must submit plans to TIC for approval. TIC has in house marketing experts, architect, planners and landscape architects to review design to meet their higher standard. For many other cities the city planners are the aesthetic and floor plan reviewer. The carrying cost of the aesthetic panel is very high and no cities could afford it unless design professionals volunteer their time like Rancho Santa Fe, Palos Verde, San Marino, Santa Barbara, Montecito and Floral Park. Places like VOC and Ladera did not have the strict aesthetic reviewing process like TIC therefore the end result is not the best. The city planners are not trained to seek for a good floor plan function or the accurate interpretation of the architectural styles.
The overhead of TIC is incorporated in the high land cost. We would not be seeing a huge price drop here.
Building cost is directly tied to the selling price. Complicated house shape like a 16 corner house with numerous courtyards could double the foundation, structural, and roof cost. Richmond American project in Portola Spring is a good example of an expensive structure. Consumers pay for the extra cost in the selling price. Houses with 4 corners with simple plans are the most cost effective to build so the selling price is most affordable such as the detached condos like Decada. Town homes and condos are the most expensive to build due to the larger structure, sound attenuation, double wall, extra shear wall and fire separation. High rise is the worst of all and that is why a unit could cost about a million. Good architect with strong discipline can design to meet the goal of floor plan and structural simplicity to help reduce the cost of the selling price. (It is extremely important to create a good house to meet the design criteria with simple forms and avoid any attachment to the neighbors’ house. The reduction of $10-30 per sf could translate up to $45,000 price reduction for a 1,500 sf home.
Site improvement such as utilities, drainage duct, street and sidewalk, landscape, irrigation are just some of the cost but the most expensive are the retaining walls and stairs for slope. Some 3 story designs with the bunkered garages in retaining walls and lifted walkways are the most expensive to build. The selling price of the home is not worth the product purchased. Architect should not even go there to complicate a house. Most consumers hate climbing 3 flights of stairs between bedrooms. (It is very important to consider the building type in reducing the site improvement cost)
Soft Cost encompasses the marketing PR, brochure printing, consultant’s fee, employees, design office, and operational budgets. Employing fewer staff and paying the architect, engineers and interior designers less could lower the overhead but this method often produces inferior architectural design. (It is not likely a factor in reducing selling price)
Company profit is limited to 6% by TIC (not likely a factor in reducing selling price)
The higher the number of homes per acre also increases the building hard cost proportionally. By attaching the units the builder could pack in more units. Logic tells us the unit should be much cheaper since the land price is constant. The high price reflected in the attached projects is paying for the high construction cost of the building.
The key for the builders is to hire the best architect who understands all the parameters of todays demanding buyers' market. A good designed house can translate to lower construction cost and yet looks good. It is a win-win solution for TIC, builders and consumers.