Sam78
New member
Visited the models on the 13th (were you there in the 13th OSguy?)
TUSD. Canyon Elem. Bechman High. Faces hills on one side.
Plan 1 resembled Saratoga Plan 1. Two changes: lobby in second floor and glass sliding doors in the first floor. My wife liked the glass sliding door in the great room. I did not like it so much, since it can bring in a ton load of dust and sand in. Too much open space for me. It almost opens up the whole room from ceiling to floor. It is selling at $855K before upgrades. Should be around 900K with standard upgrades.
Plan 2 was so much different than the Saratoga Plan 2. They removed the long workspace on 2nd floor and made it into a lobby. Nice. Starts at $950K.
All sold in Phase 1 except 2.
TUSD. Canyon Elem. Bechman High. Faces hills on one side.
Plan 1 resembled Saratoga Plan 1. Two changes: lobby in second floor and glass sliding doors in the first floor. My wife liked the glass sliding door in the great room. I did not like it so much, since it can bring in a ton load of dust and sand in. Too much open space for me. It almost opens up the whole room from ceiling to floor. It is selling at $855K before upgrades. Should be around 900K with standard upgrades.
Plan 2 was so much different than the Saratoga Plan 2. They removed the long workspace on 2nd floor and made it into a lobby. Nice. Starts at $950K.
All sold in Phase 1 except 2.