ZeroLot said:RCV said:ZeroLot said:lnc said:You could save some work for Mr. ZeroLot to do you know, since you do all the vetting already.
I've got plans for Mr. Z. He's got to install my EasyTrack Master Closet and all the other furniture inside the house. I'm debating whether or not I trust him to install the new window treatments.
Z, did you move yet?
Almost!! I had my walk-thru already with Bilt Rite as my inspector. GREAT walk-thru, we had a great time with our service rep. Irvine Pacific went above and beyond our expectations.
They had 2 IP people with us during the walk-thru and it was very pleasant. We found out so much and IP even pointed out stuff we never would have noticed ourselves. Our realtor was with us during the walk-thru and it was great having all these eyes watching out for us.
Our phase got pushed back by 2 weeks which gave IP time to really get caught up with construction. I heard Phase 5, 6, and 7 will have really quick and good closings because corporate gave the construction crew extra time to get everything together.
I also discovered a few details:
* Our washer tray is TOO small for the big jumbo LG front loaders. It's only a 29x31. We need a 30x32. So watch out for that.
* RO might not work with the fridge filter for ice cube making. They share the same under the sink water pipes so we'll have to wait to see. They suggested just popping out the fridge filter and all will be well. But that's NOT necessary unless our ice maker runs into problems.
* Concrete slab in the California Room and the garage side door are removable. So I can put pavers there if I want.
* Ask your rep how to replace those super high in the air light bulbs. I got a kick out of how it's done.
* I got to adjust how hot I want my water to be in the house. The controls are in the masters. Super cool!
There's a bunch of other stuff I learned. But the walk-thru was fantastic and we're just waiting for our keys this week.
woot woot!